







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Aliso Viejo, CA: What the Job Actually Costs and How Long It Takes
New cabinets and countertops in Aliso Viejo run $14,000 – $45,000 as part of a kitchen update, and a cabinet-and-counter swap on its own typically lands between $6,000 and $19,500 when you price the two line items together. Most jobs here take two to four weeks from demo to final caulk, with counters templated after cabinets are set. Call (855) 532-8973 and we’ll walk your kitchen and put a written, line-item number in front of you.
How a Cabinet and Countertop Job Runs, Stage by Stage

We sequence this work in a fixed order because countertops are cut to the cabinets that are already in the room. Skip a step and you’re paying for a slab that doesn’t fit.
- Stage 1 – Measure and decide (week 1, one visit plus a week of your decisions). We template the existing layout, check wall plumb and floor level, and confirm whether the boxes stay or go. During this week you pick door style, finish, and slab. This is the longest stretch on the calendar and it’s mostly you, not us.
- Stage 2 – Demo and prep (day 1, four to six hours). Old cabinets and counters come out, and we shut off and cap the water lines and disconnect the range and dishwasher. We inspect what’s behind the wall: soft drywall, old shutoffs, out-of-square framing. On Aliso Viejo homes from the 1980s and 1990s, we expect to find at least one shutoff that needs replacing.
- Stage 3 – Cabinet set (days 2 – 3). Base and wall cabinets go in, shimmed and scribed to the wall. New shutoffs go on, the dishwasher and range hook back up, and the room is ready for a counter template.
- Stage 4 – Template and fabrication (days 3 – 10, mostly waiting). The fabricator templates the installed cabinets and cuts the slab. This is the gap homeowners underestimate. Stone takes seven to ten business days in this market; laminate and butcher block can be ready in two or three.
- Stage 5 – Counter install and finish (day 10 – 11, then punch). Slab set, seams glued and color-matched, sink undermounted or drop-in set, and a bead of caulk along the wall. Final walkthrough follows, and any punch items get handled before we call it done.
Two decisions really do drive the calendar: your slab selection and whether the sink moves. Pick the slab in week one and the job stays on schedule. Change it in week two and you’re adding two weeks, not two days.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Matter: Doors, Boxes, and Slab
The kitchen decisions that move your budget most are the ones you make before the first cabinet is ordered. Here’s what we walk through on a typical Aliso Viejo job.
- Stock versus semi-custom cabinets. Stock boxes come in fixed sizes and arrive in a week or two. Semi-custom lets you hit a soffit or an odd corner and runs 15 – 30% more. In a 1980s tract kitchen with an awkward corner, semi-custom usually pays for itself in filler panels and a cleaner fit.
- Plywood versus particleboard boxes. Plywood holds up better under a sink and around a dishwasher, and it costs more. Particleboard is fine in dry cabinets and poor next to water. We’re specific about which boxes get which.
- Quartz versus granite versus laminate. Quartz gives you a consistent pattern, needs no sealing, and runs $60 – $95 a square foot installed. Granite is $50 – $80 installed and needs resealing every year or two. Laminate is $25 – $45 installed and the right call for a rental or a tight budget.
- Slab thickness and edge profile. A 2cm slab with a built-up edge and a 3cm slab both look substantial. The edge profile you pick, from eased to bullnose, changes labor, not material.
- Hardware and finish. Soft-close hinges and full-extension drawer slides are worth the small upcharge. Pulls and knobs run $3 – $12 each and are the cheapest way to change the room.
Brand partners we work with on the cabinet and finish side include KraftMaid and Kohler for sinks and faucets, with Grohe as a faucet option when you want a solid brass body. We’re honest about what each tier gets you and what it costs to move up.
What Cabinets & Countertops Costs in Aliso Viejo, CA

A cabinet-and-counter package in Aliso Viejo runs $14,000 – $45,000, with the typical single-family job landing around $22,000. That’s the number that matters, but here’s how it breaks out.
| Line item | Range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (if included) | $800 – $2,500 |
| Kitchen island | $3,000 – $10,000 |
| Full cabinets & countertops package | $14,000 – $45,000 |
Five variables push a job from the low end to the high end:
- Linear feet of cabinetry. A galley at 12 linear feet costs far less than an L-shaped kitchen at 24 feet with an island.
- Whether the layout moves. Relocating the sink, range, or dishwasher means plumbing and electrical, and that adds $2,000 – $6,000 fast. Keeping the sink where it is saves the most money on any job.
- Material grade. Stock laminate at the low end, semi-custom plywood with quartz at the high end. That gap alone is most of your spread.
- Condition behind the wall. Water damage, out-of-square framing, or a missing shutoff adds labor. In homes built in the 1980s and 1990s in Aliso Viejo, we plan for some of this.
- Permit scope. A like-for-like swap usually doesn’t require one. Moving plumbing, gas, or electrical does, and inspection adds time and a fee.
A written estimate from us lists cabinets, counters, hardware, demo, haul-away, and permit fees if any, line by line. What’s usually not included: appliance purchase, backsplash tile that wasn’t in scope, and any structural work discovered after demo. Those get a change order in writing, never a surprise invoice.
See the difference
Before
After
Before
After
Before
AfterWhat Aliso Viejo Homes Specifically Do to This Job
Aliso Viejo was almost entirely built after 1982, and the city incorporated in 2001 with planned-development standards. In practice that means your cabinet and counter job gets looked at twice: once by the city for permits and inspections, and once by your HOA for any change visible from outside or affecting shared walls. In the townhomes and low-rise condos clustered through ZIP codes 92656 and 92698, that second layer matters. A countertop swap is interior and usually HOA-exempt. Replacing a range hood with one that vents differently, or changing a kitchen window, may not be.
The housing stock is largely 1980s – 2000s Mediterranean and Spanish-style tract homes with stucco walls, concrete tile roofs, and attached garages. That build era shows up in three specific ways when we open a kitchen. First, the original shutoffs and supply lines are now 25 – 40 years old and brittle. Second, the cabinets were often built tight to a soffit, so a taller cabinet means either modifying or removing that soffit. Third, the drywall and framing behind old sink cabinets frequently has moisture damage from a slow leak nobody noticed. We plan for all three and price them if we find them.
The climate helps. Warm, dry summers and mild winters mean we don’t lose days to freezing, though hillside lots in and around Aliso Viejo do trigger erosion-control requirements on anything that touches the exterior. If your cabinet and counter job is part of a wider project, the full scope lives on our Kitchen Remodeling in Aliso Viejo page, and our Kitchen Remodeling service page covers the broader approach. Homeowners often pair this work with a Garage Conversion ADU in Aliso Viejo when they’re adding a kitchenette, or a New Detached ADU in Aliso Viejo if they’re building a separate unit with its own cooking space. We work across Aliso Viejo and the neighboring communities of Laguna Hills, Laguna Woods, Irvine, and Lake Forest.
Serving Aliso Viejo, CA – Our Local Coverage Area
We serve Aliso Viejo and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Aliso Viejo

Two to four weeks from demo to final walkthrough, with the actual construction days numbering around five to seven. The rest is slab fabrication and your decision time. A laminate or butcher-block top with stock cabinets can compress to about ten days total.
No permit is needed for a like-for-like swap where nothing moves. You do need one if the job relocates plumbing, gas, or electrical, and the city of Aliso Viejo will inspect that work. We tell you up front which category your job falls in, and we pull and pass the inspections when a permit is required.
Yes, and it’s the most cost-effective version of this job. Keeping the sink, range, and dishwasher in place means no new rough-in, no permit, and no added labor. The trade-off is that you’re locked into the existing footprint, which rules out a larger island or a relocated sink.
The full package runs $14,000 – $45,000, cabinets alone run $4,000 – $13,000, and counters run $2,000 – $6,500. The typical Aliso Viejo single-family job comes in around $22,000 once you include hardware, demo, and haul-away. Call (855) 532-8973 for an exact quote, and the estimate is free.
Every cabinet and countertop job we do is covered by our 730-Day Done Right Promise. If something isn’t right, we come back and make it right, and that’s in writing. Material warranties from the cabinet and slab makers run alongside it, and we hand you those documents at final walkthrough.
Get a Free Estimate for Cabinets & Countertops in Aliso Viejo
We’ll come out, measure your kitchen, and hand you a written line-item estimate for cabinets and countertops in Aliso Viejo at no cost. The estimate covers demo, materials, install, and any permit, with no change orders unless something unforeseen turns up after we open the wall. Call (855) 532-8973. A live person answers any hour, and we’ll get you on the schedule.
Written by the team at Groundwork Construction Co.












