Cabinets & Countertops in Tustin, CA: What You’re Actually Buying
New cabinets and countertops in Tustin typically run $14,000 – $45,000 for a full kitchen’s worth, with cabinet installation alone landing between $4,000 and $13,000 and countertops between $2,000 and $6,500. The work itself takes two to three weeks from demo to final caulk, and the number that matters most is whether you’re keeping the existing layout or moving the sink. Call (855) 532-8973 and we’ll walk your kitchen and give you a written, line-item number before anything gets ordered.
How the job actually runs, stage by stage

Most homeowners picture cabinets arriving on a truck and going straight onto the wall. That’s the last third of the job. Here’s the real sequence, with the decisions you’ll make at each point.
Stage 1: Walkthrough and layout lock (day 1, about 90 minutes)
We measure every wall, check for out-of-square corners, and open a cabinet or two to see what’s behind the drywall. This is where we find the surprises: a soffit full of ductwork, a wall that’s an inch and a half out over eight feet, or knob-and-tube-era wiring that has to be brought up before cabinets cover it. You decide the box layout here, because everything downstream depends on it.
Stage 2: Demo and rough-in (days 2 – 4)
Old cabinets and counters come out, and the walls get patched and floated flat. If the sink or range is moving, this is when the plumber and electrician rough in the new locations and the city inspects the rough work. Those inspections have to pass before cabinets go up, and in Tustin that usually means a day or two of scheduling buffer.
Stage 3: Cabinet set (days 5 – 7)
Bases go in first, leveled and shimmed, then uppers hung to a laser line. Crown and light rail get fitted, and any filler panels are scribed to the wall so the gaps disappear. You’ll confirm door style, hardware placement, and whether you want soft-close on every door or just the uppers.
Stage 4: Template and countertop fabrication (days 8 – 12)
Stone and quartz get templated after the cabinets are set, never before, because the template has to follow the actual cabinet line. Fabrication takes roughly five to seven working days. This is the quiet stretch where the kitchen looks half-finished and nothing seems to be happening. It’s normal.
Stage 5: Counter install and finish (days 13 – 16)
Slabs go down, seams get epoxied and blended, the sink and faucet get set, and the final plumbing connections are made. You’ll walk the job with us, check every drawer and door, and sign off. Any punch items get scheduled before we call it done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
These are the decisions that move both the price and how the kitchen feels ten years from now.
- Stock vs. semi-custom cabinets. Stock boxes come in fixed widths and cost the least, but they leave awkward filler strips in a kitchen with odd dimensions. Semi-custom, like the KraftMaid line we install, lets you adjust widths in quarter-inch steps and pick the finish. In the small postwar kitchens around Tustin, that flexibility is usually worth the jump.
- Plywood vs. particleboard boxes. Plywood holds screws and survives a slow leak; particleboard swells and crumbles once it’s wet. We spec plywood boxes as the default and tell you when it genuinely doesn’t matter.
- Quartz vs. granite vs. butcher block. Quartz is non-porous, needs no sealing, and handles a busy household with zero fuss. Granite is natural stone with real movement in the pattern, but it wants resealing about once a year. Butcher block is warm and cheap to refinish, and it will show every ring and knife mark. Pick quartz if you cook daily; pick butcher block if the kitchen is more display than workhorse.
- Slab thickness and edge profile. The standard 3cm slab is what most fabricators quote. A 2cm slab on a built-up edge looks substantial and can save a little, but the eased edge on 3cm is the dependable choice for a family kitchen.
- Undermount vs. drop-in sink. Undermount looks cleaner and lets you wipe crumbs straight into the basin. Drop-in is cheaper to swap later because the cutout is already there. If you’re replacing the counter anyway, go undermount.
What Cabinets & Countertops costs in Tustin, CA

A full kitchen’s worth of cabinets and countertops lands between $14,000 and $45,000. Smaller jobs scale down: cabinet installation by itself runs $4,000 – $13,000, countertop installation $2,000 – $6,500, and a kitchen island $3,000 – $10,000. Here’s what pushes a job toward one end of that range or the other.
- Linear feet of cabinetry. A tight 10-foot galley and a 25-foot wall with an island are different projects. Cabinet cost tracks directly with box count and door count.
- Material grade. Semi-custom painted maple and a mid-range quartz sit in the middle. Flat-slab doors with a natural stone top push toward the high end.
- Layout changes. Keeping the sink and range where they are saves real money. Moving either one means rough plumbing and electrical, plus an inspection.
- Existing conditions. Out-of-square walls, old galvanized supply lines, or a soffit that has to come down all add labor before a single cabinet hangs.
- Permit scope. A straight cabinet swap may not need a permit. Moving plumbing, electrical, or a wall does, and the permit and inspection fees are line items on the estimate.
Your written estimate lists cabinet brands and door styles, countertop material and square footage, sink and faucet allowance, demo and haul-away, permit fees, and labor, all separated. What it won’t include unless we agree on it up front: backsplash tile, new appliances, flooring, and any structural work behind a wall we haven’t opened yet. Those get priced as change orders, in writing, before we proceed. The number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Tustin homes specifically do to this job
Tustin has one of the widest housing ranges in Orange County, and it changes this job more than most people expect. North of El Camino Real, the flats are full of 1940s and 1950s single-story Marine barracks-era and defense-worker cottages, built with shallow pier-and-beam or slab foundations, old galvanized and cast-iron drains, and almost no wall cavity to run anything through. In those homes the cabinets are the easy part. The hard part is that the wall behind them is often out of square by an inch or more, the drain under the sink is cast iron at the end of its life, and the electrical was updated in stages over 80 years. We plan for that up front rather than discovering it mid-install.
In 92782, across Tustin Ranch and Tustin Legacy, the stock flips entirely: 1980s to 2000s two-story stucco production homes and newer high-density infill, where the kitchens are larger and the cabinets are often 20-year-old oak that’s structurally fine but dated. Both types land on our schedule in the same week, which is why we don’t quote from a template. And because the dry Santa Ana winds funnel through the Tustin plain, we pay attention to how cabinetry behaves with seasonal humidity swings: doors that fit tight in spring can bind by September if the boxes weren’t installed with the right clearances. The expansive clay soils in parts of the flats also mean we check for slab movement before setting bases, since a countertop on a settling floor will crack at the seam.
Serving Tustin, CA – Our Local Coverage Area
We serve Tustin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Tustin

Two to three weeks for a full kitchen, from demo to final walkthrough. The cabinet work happens in the first week; the stone template and fabrication takes another five to seven working days, and that gap is the part that surprises people. Smaller jobs, like counters only, can be done in about a week. Call (855) 532-8973 for a schedule that fits your kitchen.
Sometimes. A straight replacement with no plumbing, electrical, or structural changes often doesn’t require one. Moving a sink, adding a circuit for a new range, or opening a wall does, and we pull those permits and coordinate the inspections. We’ll tell you exactly which side of that line your job falls on before we start.
Yes, and it’s the most common way we do it. Keeping the sink and range in place means no rough plumbing, no electrical relocation, and a shorter timeline. The trade-off is that you’re working within the existing layout. If the current kitchen has a dead corner or a cramped work triangle, moving the sink is usually the single change that fixes it, and it’s worth pricing both ways.
Most full kitchens run $14,000 – $45,000. Cabinet installation alone is $4,000 – $13,000, countertop installation $2,000 – $6,500, and a kitchen island $3,000 – $10,000. Material grade, layout changes, and the condition of the walls behind the old cabinets are the biggest swing factors. Call (855) 532-8973 for an exact quote. Estimates are free and itemized.
Every cabinets & countertops job is covered by our 730-Day Done Right Promise. If something isn’t done right, we come back and make it right, for two full years after the final walkthrough. That covers our installation workmanship, and the manufacturer warranties on the cabinets and stone ride alongside it.
If the cabinets are part of a bigger plan, homeowners often pair this with a Kitchen Remodeling in Tustin scope that folds in lighting, flooring, and layout changes, or with a Garage Conversion ADU in Tustin or a New Detached ADU in Tustin when a second kitchen is going in. Those all run through our Kitchen Remodeling service, and we cover the full Tustin area including 92780, 92781, and 92782.
Get a written number before you order a single box
Call (855) 532-8973 to schedule a free on-site estimate for cabinets & countertops in Tustin. A live person answers, day or night. We’ll measure the kitchen, walk through the cabinet and countertop options, and hand you an itemized written quote with the permit scope spelled out. No-hassle upfront pricing, 0% financing for 18 months, and $1,000 off projects over $10,000. The number you see is the number you pay.