







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Irvine: What the Job Actually Costs and How Long It Takes
Replacing cabinets and countertops in Irvine usually runs $14,000 to $45,000 for a full kitchen’s worth of both, and most jobs are finished in two to four weeks from demolition to final caulk. Cabinet installation alone lands at $4,000 to $13,000; countertop installation at $2,000 to $6,500; a new island at $3,000 to $10,000. The two phases are sequenced, not simultaneous, because countertops get templated only after the cabinets are set and level. Call (855) 532-8973 and we’ll walk your kitchen and put real numbers on it.
How We Run a Cabinet and Countertop Job, Stage by Stage

Cabinet and countertop work is a chain of dependencies. Get the order wrong and you’re paying for a second template visit or a stone that doesn’t fit. Here’s the real sequence we follow in Irvine homes.
Stage 1: Measure, design, and order (week one)
We measure the actual walls, not the drawing. In Irvine’s older tract homes, that matters: 1970s-and-1980s framing is rarely square, and a wall that’s out three-quarters of an inch over ten feet changes the filler and panel plan. You decide cabinet door style, finish, and box construction here, and you lock the countertop material. Lead times run three to six weeks on semi-custom cabinets and one to three weeks on most quartz slabs, so this stage sets the whole calendar.
Stage 2: Demolition and prep (days one and two)
Out come the old cabinets, countertops, and sink. We protect the flooring and isolate the work zone with plastic and zip walls; stone dust travels. If you’re keeping the same footprint, plumbing and electrical usually stay put and get reconnected rather than moved. If you’re relocating the sink or adding a cooktop circuit, that rough-in happens now, before cabinets go in.
Stage 3: Cabinet setting and leveling (days three through five)
Base cabinets get set, shimmed, and screwed to studs. Uppers get hung to a laser line. This is the slow, unglamorous part, and it’s where a job is won or lost: the countertop template is only as accurate as the cabinet run underneath it. Crown, light rail, and toe kick go on at the end of this stage. You’ll want to be available to confirm hardware placement before we drill.
Stage 4: Template, then countertop fabrication (days six through twelve)
A templater comes out with the cabinets in place and cuts a physical or digital template of every run, including the sink cutout and any cooktop. Fabrication takes five to ten business days depending on the slab and edge profile. During that gap, the kitchen is usable but counterless.
Stage 5: Countertop install, sink, and finish (days thirteen through eighteen)
Slabs come in, get set, seamed, and siliconed. The undermount sink gets attached, the faucet goes on, and the dishwasher gets reconnected. Then we do the final walkthrough: door alignment, drawer glide adjustment, seam check, and caulk lines. That’s the moment to point out anything that bugs you.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and What Each One Costs You Later
Most of the decisions on this job come down to three or four real forks. Here’s how we frame them when a homeowner asks.
- Stock vs. semi-custom cabinets. Stock boxes in standard sizes are the fastest and least expensive route. Semi-custom gets you non-standard widths, deeper uppers, and the door style you actually wanted. In a mid-century Irvine tract kitchen with odd wall lengths, semi-custom usually saves money in the long run because fillers and custom panels cost more than the upcharge for a correct-size box.
- Quartz vs. natural stone. Quartz is non-porous, doesn’t need sealing, and holds up in a busy household. Granite and marble are gorgeous but want periodic sealing and are more forgiving of nothing. Marble etches; a lemon wedge left overnight will mark it. Know that going in.
- Slab thickness and edge profile. Standard 2cm or 3cm slabs; a built-up edge adds cost and visual weight. Simple eased edges are clean and inexpensive. A mitered edge reads thicker and costs more in labor.
- Sink and cooktop configuration. An undermount sink requires the countertop fabricator to cut and polish the opening; a drop-in sink does not. If you’re switching from drop-in to undermount, plan for it at template time, not after.
- Drawer and door hardware. Soft-close and full-extension glides are standard on most lines now. Upgrade pulls and knobs are a small line item with a big visual payoff.
Cabinets & Countertops Cost in Irvine, CA: The Real Range and What Moves It

Plan on $14,000 to $45,000 for cabinets and countertops together in Irvine. That range is wide because five variables carry most of the weight.
- Linear footage and layout. A galley or single-wall kitchen at 12 to 15 linear feet sits near the bottom; an L-shape with an island at 25-plus feet pushes toward the top.
- Cabinet grade and door style. Stock flat-panel vs. semi-custom shaker vs. full-custom inset. Inset doors cost more in labor because every box has to be built to tighter tolerances.
- Countertop material. Laminate is the value play; quartz is middle; natural stone and book-matched slabs sit at the top. A single slab of a rare stone can cost more than every cabinet in the room.
- Plumbing and electrical relocation. Moving the sink, adding a cooktop circuit, or relocating the dishwasher adds hours of licensed trade work and inspection.
- Island addition. A new island, including the cabinet base, countertop, and any electrical, runs $3,000 to $10,000 on its own.
Your written estimate should itemize cabinets, countertops, demolition, installation labor, sink and faucet, and permit fees if any. What it typically won’t include: appliance cost, backsplash tile, plumbing fixture upgrade beyond the standard, and any wall or framing repair found behind the old cabinets.
See the difference
Before
After
Before
After
Before
AfterWhat Irvine Homes Specifically Do to a Cabinet and Countertop Job
Irvine is a master-planned city, and the kitchen work here reflects that. Much of the housing stock runs from the 1970s through the 2010s: Mediterranean and Spanish-style stucco-and-tile tract and semi-custom homes across villages like Woodbridge, Northwood, and Turtle Rock. That matters for cabinets in a few specific ways. First, the wall framing is rarely square; expect fillers and shims. Second, the cabinet boxes themselves are often original particleboard, and when we pull them we frequently find water staining at the sink base and soft spots under the dishwasher. Third, the village architectural approval layer: any change visible from outside, and anything touching the building envelope, has to clear the village’s architectural committee before it clears the city. A new window or exterior door tied to a kitchen reconfigure is the most common case. For the wider project scope, this work is often part of a full Kitchen Remodeling in Irvine, and our Kitchen Remodeling page lays out the broader sequencing.
Serving Irvine, CA – Our Local Coverage Area
We serve Irvine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQ: Cabinets & Countertops in Irvine

Two to four weeks total, most of it waiting on cabinet and countertop lead times rather than on labor. The physical work is typically six to ten days on site; the template-to-install gap for stone is another five to ten business days. Call (855) 532-8973 and we’ll build a calendar around your materials.
Usually no, if you’re doing a like-for-like swap and keeping the plumbing and electrical in the same locations. You do need one when you relocate plumbing, add or move electrical circuits, remove a wall, or change the exterior envelope. Irvine’s own building-permit process, plus village architectural approval for exterior changes, is part of the job in planned-community villages. We pull and manage the permits; you don’t touch paperwork.
Yes, and most of our Irvine jobs stay in the same footprint. The sink and appliances go back in their original locations, the rough-in gets reconnected rather than relocated, and this keeps the project at the low end of the cost range. It’s the owner’s call, made at design, not discovered halfway through demo.
$14,000 to $45,000 for the full job, with cabinet installation at $4,000 to $13,000 and countertop installation at $2,000 to $6,500 as line items. The drivers are linear footage, cabinet grade, countertop material, and whether you move any plumbing or electrical. Call (855) 532-8973 for an exact quote – the estimate is free and you get it in writing.
Every project we run carries the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space, and it applies to the install, not just to the materials. Cabinet and slab manufacturers carry their own product warranties on top of that.
Get a Free Estimate on Your Cabinets & Countertops in Irvine
If you’re ready to stop guessing at the number, call (855) 532-8973 for a free on-site estimate on your cabinets & countertops. We’ll measure the actual walls, talk through cabinet grade and countertop material, and hand you a written line-item estimate with the price locked in. Homeowners covering Irvine also pair this work with a Garage Conversion ADU in Irvine or a New Detached ADU in Irvine; we handle all three under one contract. Background-checked technicians, upfront pricing, no surprises. 0% financing for 18 months, and $1,000 off projects over $10,000.
Written by the team at Groundwork Construction Co.












